国产av无码专区亚洲av男同,激情人妻另类人妻伦,久久精品这里热有精品,女人高潮特级毛片

上海金泰工程機(jī)械有限公司
上海安亭洛浦路45號 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

国产精品乱码在线观看| 国产精品毛片无遮挡高清| 久久久久亚洲精品男人的天堂| 粗了大了 整进去好爽视频| 天天噜日日噜狠狠噜免费| 韩国无码av片在线观看网站| 人人澡人人澡人人看添av| 亚洲欧美日韩久久精品| 九九精品99久久久香蕉| 国模冰莲极品自慰人体| 人人妻人人澡人人爽欧美二区 | 精品无码一区二区三区爱欲 | 国产激情无码一区二区| 丰满多毛的大隂户视频| 日韩性爱视频| 亚洲av无码国产在丝袜线观看| 人妻少妇不满足中文字幕| 国产在线精品一区二区三区| 久久99精品久久水蜜桃| 六月丁香综合在线视频| 欧美色欧美亚洲另类二区| 无码粉嫩虎白一线天在线观看| 内射干少妇亚洲69xxx| 久久国产精品-国产精品| 亚洲最大成人网站| 男女一边摸一边做爽爽| 久久久精品波多野结衣| 先锋影音xfyy5566男人资源| www插插插无码免费视频网站| 巨大巨粗巨长 黑人长吊| 国产破外女出血视频| 少妇伦子伦精品无码styles| 亚洲 卡通 欧美 制服 中文| 亚洲国产欧美在线观看| 女人被弄到高潮的免费视频| 狼人香蕉香蕉在线28 - 百度| 少妇高潮尖叫黑人激情在线| 天堂网在线最新版www| 老鲁夜夜老鲁| 国产精品无码av天天爽| 人妻夜夜爽天天爽|