国产av无码专区亚洲av男同,激情人妻另类人妻伦,久久精品这里热有精品,女人高潮特级毛片

上海金泰工程機(jī)械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

亚洲av成人无码网天堂| 亚洲日韩精品一区二区三区无码| 午夜无码国产理论在线| 天天躁日日躁狠狠躁av麻豆 | 亚洲av无码一区东京热久久| 色五月丁香五月综合五月| 中文字幕精品久久久久人妻| 欧美又大又色又爽aaaa片| 中国猛少妇色xxxxx| 顶级欧美熟妇高潮xxxxx| 99蜜桃在线观看免费视频网站| 國产一二三内射在线看片| 粉嫩少妇内射浓精videos| 亚洲国产成人精品女人久久久| 又黄又爽又色的视频| 一本久久综合亚洲鲁鲁五月天| 色哟哟最新在线观看入口| 亚洲精品无码mv在线观看| 开心久久婷婷综合中文字幕 | 日日天干夜夜狠狠爱| 亚洲一区二区三区影院| 影音先锋人妻啪啪av资源网站| 丰满少妇弄高潮了www| 精品一区二区三区免费视频| 日本熟妇浓毛| 色婷婷一区二区三区四区成人网| 乱精品一区字幕二区| 精品人人妻人人澡人人爽牛牛| 人妻少妇精品久久| 国产精品嫩草影院av| 成人无码区免费a片www| 欧美乱人伦人妻中文字幕| 亚洲av无码国产精品麻豆天美| 免费无码精品黄av电影| 九九在线中文字幕无码| 欧美激情综合色综合啪啪五月| 丁香美女社区| 久久99精品久久久久久hb无码| 天天爱天天做天天爽| 八区精品色欲人妻综合网| 狠狠的干性视频|