国产av无码专区亚洲av男同,激情人妻另类人妻伦,久久精品这里热有精品,女人高潮特级毛片

上海金泰工程機(jī)械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

成人综合伊人五月婷久久 | 性欧美暴力猛交69hd| 亚洲天堂2017无码| 人妻少妇乱子伦无码视频专区| 久久久国产打桩机| 夜夜爽夜夜叫夜夜高潮| 与子敌伦刺激对白播放| 富婆如狼似虎找黑人老外| 久久久久久久久无码精品亚洲日韩| 极品少妇小泬50pthepon | 国产精品扒开腿做爽爽爽视频| 免费a级毛片在线播放| 国产在线永久视频| 女人高潮被爽到呻吟在线观看 | 在线欧美中文字幕农村电影 | 国产日韩综合一区二区性色av| 国产成人无码一二三区视频 | 日韩高清国产一区在线| 伊伊人成亚洲综合人网香| 亚洲国产精品成人精品无码区在线| 无码一区二区三区在线观看| 无码人妻久久一区二区三区| 台湾佬中文娱乐网22| 国语精品一区二区三区| 欧美三级午夜理伦三级| 麻豆国产av超爽剧情系列| 国产一区二区女内射| 97精品国产手机| 久久精品卫校国产小美女| 国产av天堂无码一区二区三区| 亚洲午夜久久久久妓女影院| 日本十八禁视频无遮挡 | 蜜芽亚洲av无码精品色午夜| 久久精品国产99久久久古代| 亚洲精品无码久久| 一本大道东京热无码| 高潮抽搐潮喷毛片在线播放| 色婷婷亚洲一区二区三区| 国产精品久久久福利| 亚洲日韩国产精品第一页一区| 国产日产欧产美韩系列麻豆|