国产av无码专区亚洲av男同,激情人妻另类人妻伦,久久精品这里热有精品,女人高潮特级毛片

上海金泰工程機(jī)械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

性色av无码中文av有码vr| 理论片午午伦夜理片影院| √新版天堂资源在线资源| 欧美 丝袜 自拍 制服 另类| 色妺妺视频网| 国产成人无码aa精品一区| 欧美伦费免费全部午夜最新| 欧美大成色www永久网站婷| 东京无码熟妇人妻av在线网址| 亚洲综合国产成人丁香五月激情| 国产精品久久久久久久久岛| 十八禁视频在线观看免费无码无遮挡骂过 | 成人毛片100免费观看| 性生交大全免费看| 国产av国片精品| 男人吃奶摸下挵进去啪啪软件| 精品无码人妻一区二区三区不卡| 午夜dv内射一区二区 | 亚洲日韩精品国产一区二区三区| 亚洲精品国产第一综合99久久| 日本乱偷人妻中文字幕| 欧美综合自拍亚洲综合图| 不卡一卡二卡三乱码免费网站| 少妇又色又紧又爽又刺激视频| 人妻体内射精一区二区三区| 欧美日本国产va高清cabal| 99精品欧美一区二区三区| 黑人巨大精品欧美| 亚洲欧美精品午睡沙发| 色婷婷五月天| 小13箩利洗澡无码免费视频| 国产无遮挡又黄又爽高潮 | 后入内射欧美99二区视频| 亚洲乱码国产乱码精华| 中文字幕无码日韩专区免费| 中国gay片男同志免费网站| 亚洲 欧美 另类 在线| 瑜伽裤国产一区二区三区| 久久久久国产一区二区| 亚洲精品无码av中文字幕| 无码人妻av免费一区二区三区|