国产av无码专区亚洲av男同,激情人妻另类人妻伦,久久精品这里热有精品,女人高潮特级毛片

上海金泰工程機械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

97日日碰曰曰摸日日澡| 亚洲av无码一区二区三区网站 | 日本熟妇人妻xxxx| 边啃奶头边躁狠狠躁| 米奇7777狠狠狠狠视频影院| 免费看无码特级毛片| 国产精品理论片在线观看| 久久综合亚洲色hezyo国产| 亚洲无av码一区二区三区| 久久精品第九区免费观看| 人妻无码一区二区视频| 欧美人妻精品一区二区三区| 国产美女被遭强高潮免费网站| 波多野结衣乳巨码无在线| 高清偷自拍第1页| 思热99re视热频这里只精品| 久久亚洲精品无码av| 日韩经典午夜福利发布| 国产自国产自愉自愉免费24区| 欧美丰满熟妇乱xxxxx图片| 色综合中文综合网| 三年片在线视频中国| 人妻体内射精一区二区| 狠狠做深爱婷婷久久综合一区| 精品无码一区二区三区爱欲| 夜夜躁日日躁狠狠久久av| 三年片在线视频中国| 久久久不卡国产精品一区二区| 精品无码三级在线观看视频| 国产精品天干天干| 欧美尺寸又黑又粗又长| 精品人妻人人做人人爽| 人妻 色综合网站| 亚洲av综合色区| 国产猛烈高潮尖叫视频免费| 国产精品无码一区二区三区免费| 久久精品午夜福利| 国产乱子伦视频在线观看| 亚洲色成人www永久网站| 文中字幕一区二区三区视频播放 | 熟女无套高潮内谢吼叫免费|