国产av无码专区亚洲av男同,激情人妻另类人妻伦,久久精品这里热有精品,女人高潮特级毛片

上海金泰工程機(jī)械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

亲子乱aⅴ一区二区三区下载| 国产一精品一av一免费| 久久一日本道色综合久久| 毛片tv网站无套内射tv网站 | 侵犯人妻教师波多野吉衣| 影音先锋中文字幕无码资源站| 国产成a人亚洲精品无码樱花| 国产呻吟久久久久久久92| 午夜视频在线在免费| 内射少妇36p亚洲区| 亚洲av第一成肉网| 欧美精品18videosex性欧美| 蜜臀av无码人妻精品| 欧美成人精品第一区| 国产精品99无码一区二区| 亚洲av无码久久精品蜜桃| 夜夜添无码一区二区三区 | 亚洲午夜无码久久| 无码无套少妇18p在线直播| 国产精品久久午夜夜伦鲁鲁| 性欧美丰满熟妇xxxx性久久久| 国产成人精品久久| 无套内谢孕妇毛片免费看 | 97在线观看视频| 三级全黄的视频在线观看| 人人妻人人澡人人爽人人dvd| 人妻洗澡被强公日日澡电影| 又黄又爽又色视频| 国产精品视频二区不卡| 天天碰免费上传视频| 亚洲国产av一区二区三区四区| 亚洲 日韩 欧美 成人 在线观看 | 中国老熟妇506070| 久久久久无码国产精品一区| 欧美人与动牲交a精品| 少妇人妻综合久久中文字幕| 无码av一区二区三区无码| 三级4级全黄60分钟| 亚洲av无码久久| 无码夜色一区二区三区| 亚洲av激情无码专区在线播放 |